Monitoring Engineer, BFK
Summary
Publication Date
Lord Hill’s Bridge Mitigation Works
Lord Hill’s Bridge (LHB) was the first piece of infrastructure that the Western tunnels TBM’s passed beneath, at a depth no greater than 4 m be...
03/11/2014
The Use of Shape Accel Array for Monitoring Utilities during Urban Tunnel Drives
The protection of third party assets with reliable monitoring instruments is essential for the running of a successful urban tunnelling project. Wi...
03/11/2014