Design Team Leader C121, Mott MacDonald
Summary
Publication Date
Delivering a Safe Integrated SCL Design: The Challenges and Successes of Crossrail Contract C300/C410
The design delivery for the sprayed concrete linings (SCL) for Crossrail contract C300/C410 Western Running Tunnels and Station Caverns has involve...
03/11/2014
Crossrail Sprayed Concrete Linings
This paper looks at the sprayed concrete lined (SCL) tunnel design by Mott MacDonald for the Crossrail project. The SCL design consists of five new...
03/11/2014