Summary
Publication Date
An Investigation of Surface Settlement and Volume Loss Associated with SCL Tunnelling at Stepney Green

The Stepney Green Crossrail site consists of a box shaft connected to two underground sprayed concrete lined (SCL) tunnels. The two tunnels (eastbo...

09/07/2018