Summary
					Publication Date
				
							Comparison Between Sprayed and Cast In-Situ Concrete Secondary Linings at Bond Street and Farringdon Stations
							
						A joint venture of BAM, Ferrovial and Kier (BFK) have constructed the station tunnels at both Bond Street and Farringdon Stations, as part of Cross...
31/08/2016
					
							Robotic Application of a 50 mm Thick Sprayed Concrete Fireproofing Layer
							
						The design of the tunnels at Crossrail’s Bond Street Station (C300/C410) includes a final sprayed concrete fireproofing layer. This layer covers ...
31/08/2016
					