Crossrail Water Consumption Dataset | Dataset |
Crossrail Ltd (CRL) required its tier 1 contractors to record water consumption on a periodic basis. A summary dataset has been made available on water consumption across the Crossrail Central Section Contracts. This dat... |
Matthew Barnes BSc MA CEnv MIEMA | 09/07/2018 |
Crossrail’s Experience of Geotechnical Baseline Reports – A Client’s Perspective – Presentation | Video |
This recorded presentation describes Crossrail’s experience of GBRs from the client’s perspective. It covers why Crossrail adopted GBRs, where they were adopted and summarises how they were adopted. A semi quantitati... |
John Davis EurGeol CGeol MSc DIC, Mike Black BSc(Hons) MSc CSci CGeol FGS | 17/05/2018 |
Corporate Information Handover Project – Enabling Data Migration | Micro-report |
To ensure the migration of the required data to Crossrail’s infrastructure maintainers and TfL in an accurate and timely process, Crossrail needed to organise its corporate data so that it can be accessed as part of an... |
Tahir Ahmad | 09/07/2018 |
Design and Construction of Inclined Escalator Shafts and Stair Adit at Liverpool St and Whitechapel Stations | Technical Paper |
Escalator shafts are essential for underground stations as they provide access from ticket halls typically at surface level to the deep platform tunnels. The design and construction of these inclined tunnels can present ... |
Eleanor Sillerico Mayta MSc, Jose Suarez Diaz MSc CEng MICE, Romain Vivier Ing(Fr), Eric Marchand, Sam Ahmad MSc BEng CEng MICE, ICE Publishing | 09/07/2018 |
Damage assessment and monitoring for buildings on the Elizabeth line | Journal Publication |
The Elizabeth line, due to open in December 2018, crosses London from west to east. The Crossrail project to construct the Elizabeth line has seen 21km of twin-bored tunnels constructed under central London, with eight n... |
Deborah Lazarus MA(Cantab) CEng FIStructE FICE FRSA, Hyuk-Il Jung BSc MEng PE(Korea), The Structural Engineer | 02/07/2018 |
Protection against fire for the UK Crossrail tunnel structures | Technical Paper |
The UK London Crossrail project was devised to improve transportation links across a city faced with an increasing population density and a growing demand for greater public transport utilisation. The central section of ... |
Mike King BSc CEng MICE, ICE Publishing | 09/07/2018 |
Crossrail Operations and Maintenance Information Guide | Good Practice Document |
For the efficient operations and maintenance of the Elizabeth Line, it is essential that all O&M material be submitted in a structured and accessible format to enable the information to be related to relevant assets.... |
Crossrail Ltd | 09/07/2018 |
An Investigation of Surface Settlement and Volume Loss Associated with SCL Tunnelling at Stepney Green | Technical Paper |
The Stepney Green Crossrail site consists of a box shaft connected to two underground sprayed concrete lined (SCL) tunnels. The two tunnels (eastbound and westbound) comprise large SCL caverns, with the largest cross-sec... |
Anthony Ssenyonga MEng, ICE Publishing | 09/07/2018 |
Management and Client Assurance of Contractual Drawing Deliverables | Micro-report |
This document aims to provide insight into Crossrail’s method of processing contractual drawing deliverables received from the supply chain, ensuring a simple approach where possible to manage the extensive output from... |
Pinal Patel | 09/07/2018 |
CAD Support Metrics | Micro-report |
The technical management of the design data required to safely and efficiently complete the Crossrail project was a huge challenge. The Crossrail CAD Services team was responsible for administering the Electronic CAD Man... |