Document Search
Document Title | Document Type | Abstract | Authors | Publication date |
---|---|---|---|---|
CEEQUAL – Case Studies | Good Practice Document |
On the central section all tunnels, portals (transition structures between surface and tunnel) & shafts (vertical structures linking the tunnel to the surface) have been assessed using the Civil Engineering Environme... |
Crossrail Ltd | 30/01/2018 |
Crossrail Equality Impact Assessment | Good Practice Document |
The Crossrail project aimed to incorporate good inclusivity practice into the planning, implementation and operational phases of the operational railway. With a project of the size and complexity of Crossrail the timefra... |
Crossrail Ltd | 16/01/2006 |
Fatigue Management | Technical Paper |
Fatigue has the potential to have a significant impact on safety, performance and health. In the construction industry fatigue management focuses on the risks associated with shiftwork, rather than a whole system approac... |
Christina Butterworth RN, SCPHN, Hon.FFOM | 13/03/2018 |
The Appraisal and Business Case for Crossrail | Micro-report |
The Business Case for Crossrail developed along with the evolving scheme during the period until the Crossrail Bill was submitted, and was revised in 2010 alongside the Comprehensive Spending Review. Several innovations ... |
Paul Buchanan | 13/03/2018 |
Application of the Observational Method on Crossrail projects | Technical Paper |
This paper describes the use of the Observational Method (OM) on three Crossrail station excavations. Firstly, at Tottenham Court Road, Western Ticket Hall excavation where a code compliant design was started. By the thi... |
Ying Chen, Duncan P Nicholson BSc MSc DIC CEng MICE, Peter Ingram, Stuart Hardy, Hock Liong Liew BEng MEng PE(Civil) Singapore, Imran Farooq BSc MSc CEng MICE MASCE, Giovanna Biscontin | 10/11/2015 |
Pushing the limits of Secant Walling | Technical Paper |
Bond Street Eastern Ticket Hall, located at Hanover Square to the South of Oxford Street, is one of the flagship construction sites on the Crossrail project. The Eastern Ticket Hall will provide a new entrance to the sta... |
Gareth Hales | 10/11/2015 |
Review of Monitoring Methods at Three Crossrail Stations | Technical Paper |
Laing O’Rourke have undertaken the construction of three Crossrail Stations; Custom House (C520), Liverpool Street (C502) and Tottenham Court Road (C422). On each of these projects the monitoring work has been self del... |
Peter Hewitt, Celina Peeters, Robert Roles, Ben Brewster | 10/11/2015 |
IncloView | Technical Paper |
The visualisation of inclinometer data over time has consisted of basic line graphs with very basic provision for time dated excavation depth, prop positions, soil profiles or wall performance design curves. The data is ... |
Paul Thurlow | 10/11/2015 |
Information Gathering leaflet | Good Practice Document |
Crossrail needed to make enquiries to establish land ownership, and carry out ground investigation at the earliest stages of scheme development, before public consultation. This leaflet was created to explain the project... |
Crossrail Ltd | 01/05/2003 |
Compensation Grouting | Technical Paper |
Compensation grouting was selected by Crossrail as a settlement mitigation measure at a number of key locations along the route. This paper describes the works on the western section, as part of contracts C300 and C410 w... |
Owen Frances, R Hayman-Joyce | 10/11/2015 |