Summary
Publication Date
Field measurement by fully grouted vibrating wire piezometers

Subsurface instrumentation was installed at a field monitoring site in Hyde Park and bordering Bayswater Road for measuring the ground responses to...

03/11/2014
Lessons learnt from the installation of field instrumentation to monitor ground response to tunnelling

Imperial College in collaboration with Crossrail are performing field monitoring research to investigate the effect of tunnelling in London Clay. T...

03/11/2014
In Situ Stress Strain Measurements at Tottenham Court Road Platform Tunnel

The redevelopment of Tottenham Court Road Underground Station started in 2011 as part of the Tube Upgrade Plan to improve and increase the capacity...

03/11/2014
Tunnelling induced strains and deformations at Central Line

In October and November 2012, Imperial College installed electrical resistance strain gauge rosettes, potentiometric displacement transducers and t...

03/11/2014