Summary
Publication Date
Geotechnical Risk Management for Sprayed Concrete Lining Tunnels in Farringdon Crossrail Station

The proposed Crossrail station will comprise two ticket halls, two escalator/concourse tunnels, two platform tunnels, numerous cross passages and v...

03/11/2014
Temporary Sprayed Concrete Lining Tunnels in Farringdon Crossrail Station

Two additional temporary sprayed concrete lining (SCL) structures were designed in addition to the base design, and constructed for Crossrail at Fa...

07/09/2015
Taking the strain, coping with pressure or shooting targets? An objective comparison between monitoring solutions within sprayed concrete lined tunnels at Crossrail Farringdon Station, London

Methods of monitoring the structural behaviour of tunnels during construction traditionally rely on in-tunnel displacement monitoring, with designe...

31/08/2016