Amalgamation of Tunnel Secondary Lining and First Stage Concrete at Whitechapel Crossover
After completion of primary lining construction for the Whitechapel Crossover, a value engineering exercise was undertaken to save time within the ...
30/09/2017
Design methodology for permanent complex structures: Secondary lining design of junctions
Crossrail Contract C121’s scope is the design of the SCL (sprayed concrete lining) permanent structures of five new underground stations (Liverpo...