Document Search
Document Title | Document Type | Abstract | Authors | Publication date |
---|---|---|---|---|
Example Innovation Period Report | Good Practice Document |
Example of a report from the Innovation Programme which fed into the Crossrail period report, describing activities and challenges. |
Crossrail Ltd | 26/02/2016 |
Innovation Management Procedure | Good Practice Document |
The Innovation Management Procedure describes the processes and procedures used in managing investment in and delivery of innovations. |
Crossrail Ltd | 26/02/2016 |
Implementing the Crossrail Innovate18 Programme | Micro-report |
This micro-report explains why the Crossrail Innovation Programme, Innovate18, was established, and how it was implemented. It includes the plan, procedure and document used to manage the process. It will be of interes... |
Marie Gilmour BEng (Hons), MAPM | 26/02/2016 |
Bedlam Burial Ground Project Design | Good Practice Document |
This archaeological project aimed to compile a burial register for the Bedlam burial ground excavated by Crossrail from 2011-2015, in order to find out who was buried there and where they came from. The knowledge generat... |
Marit Leenstra | 26/05/2015 |
Crossrail Portals to the Past an Exhibition of Archaeology Finds | Journal Publication |
As a publically-funded project, a key objective is to communicate the project to our stakeholders and the public at large, in an immediate way. This article outlines how the 2014 ‘Portals to the Past’ exhibition was ... |
Jay Carver BA (Hons) MIFA | 13/06/2014 |
The Challenges and Opportunities for Mega-Infrastructure Projects and Archaeology | Journal Publication |
This paper focuses on Crossrail as its case study, whilst referencing other projects in the recent experience of the author. It endeavours to put forward some fundamental, some practical and some more complex approaches ... |
Jay Carver BA (Hons) MIFA | 09/10/2013 |
London Crossrail the New Churchyard AD 1569 to AD 1714 | Journal Publication |
In AD1569 a new burial ground was set out in the north of the City of London to cope with the ever increasing demands for burial space within the local parishes. Increasing population, together with 16th century disease ... |
Jay Carver BA (Hons) MIFA | 30/11/2012 |
The London Crossrail Project: Desk Study Reconnaissance and Evaluation. Data Sources and Outcomes Liverpool Street a Case Study | Journal Publication |
This paper looks at how a wide variety of desk study sources, reconnaissance exercises, ground deposit modeling and site testing evaluation methods has allowed the development of an informed project design to be develope... |
Jay Carver BA (Hons) MIFA, Michael Court, Nicholas Elsdon | 30/09/2011 |
Tunnelling induced strains and deformations at Central Line | Technical Paper |
In October and November 2012, Imperial College installed electrical resistance strain gauge rosettes, potentiometric displacement transducers and tape extensometer eye bolts at selected locations in the Central Line east... |
Jessica Yu BE MSc DIC MICE, Jamie R Standing BEng DIC MSc PhD CEng MICE, Robert Vollum MSc PhD DIC CEng MIStructE, David Potts PhD DSc FREng CEng FICE FCGI, ICE Publishing | 03/11/2014 |
In Situ Stress Strain Measurements at Tottenham Court Road Platform Tunnel | Technical Paper |
The redevelopment of Tottenham Court Road Underground Station started in 2011 as part of the Tube Upgrade Plan to improve and increase the capacity of the existing facility. The plan is to upgrade the station by 2016 to ... |
Jessica Yu BE MSc DIC MICE, David Potts PhD DSc FREng CEng FICE FCGI, Jamie R Standing BEng DIC MSc PhD CEng MICE, Robert Vollum MSc PhD DIC CEng MIStructE, ICE Publishing | 03/11/2014 |