Document Search

Document Title Document Type Abstract Authors Publication date
Tunnel Energy Segments Journal Publication

Significant heat is generated by underground trains, particularly when braking, stopping at platforms and accelerating away from stations. A complex ventilation system including shaft, fans and under-platform extraction ...

Mike de Silva BSc PhD FCIWEM MIEEM CSci C.WEM, ICE Publishing 30/06/2014
Designing Out Waste Good Practice Document

Crossrail follows the Waste Resources Action Programme (WRAP) supported Designing Out Waste process, identifying opportunities in a collaborative work shop including client, designer & contractor.  Once opportunitie...

Mike de Silva BSc PhD FCIWEM MIEEM CSci C.WEM 26/02/2016
Non-Road Mobile Machinery Micro-report

In 2012 less than 40% of all construction plant and equipment on Crossrail construction sites were fitted with diesel particulate filters or cleaner Euro Stage IIIB engines. By 2015 this had increased to over 80%. This l...

Cathy Myatt MA MSc 26/02/2016
Section 61 Consents Guidance Note Good Practice Document

This paper sets out the guidance that the nominated undertaker was to adopt when applying for section 61 consents for Crossrail construction works, and also sets out the level of information to be provided in support of ...

Crossrail Ltd 26/02/2016
Crossrail Route Wide Generic Activities Land Contamination Report Good Practice Document

A contaminated land assessment was carried out as part of the Crossrail Environmental Impact Assessment. The results were reported in the Crossrail Environmental Statement submitted with the hybrid Bill. A Contaminated L...

Crossrail Ltd 26/02/2016
General Ecology Management Plan Good Practice Document

When the Crossrail Hybrid Bill was introduced into the House of Commons it was accompanied by an Environmental Statement (including the supporting Ecology Technical Specialist Report) which presented the outcomes of the ...

Crossrail Ltd 26/02/2016
Archaeology Generic Written Scheme of Investigation Good Practice Document

During the planning stages of Crossrail it was noted that there was the potential for finding archaeological remains at many sites across the Crossrail route during excavations and other construction works and that works...

Crossrail Ltd 26/02/2016
Water Resources Strategy Good Practice Document

The Water Resources chapter of the Construction Code required Crossrail to prepare a strategy for handling water resources issues in consultation with the Environment Agency (EA) that would be based on accepted industry ...

Crossrail Ltd 26/02/2016
Construction Code Good Practice Document

The Construction Code forms part of the Environmental Minimum Requirements (EMR) for Crossrail. The Code was developed by Crossrail in consultation with local authorities and other relevant stakeholders during the passag...

Crossrail Ltd 26/02/2016
Information Academy Micro-report

In order to create the world class outcomes Crossrail desires, it required world class inputs; therefore having project team members, contractors and the supply chain to understand the Technical Information (BIM) strateg...

Tahir Ahmad 26/02/2016