C121 Design Manager
Summary
Publication Date
Design and Construction of Inclined Escalator Shafts and Stair Adit at Liverpool St and Whitechapel Stations
Escalator shafts are essential for underground stations as they provide access from ticket halls typically at surface level to the deep platform tu...
09/07/2018
Design methodology for permanent complex structures: Secondary lining design of junctions
Crossrail Contract C121’s scope is the design of the SCL (sprayed concrete lining) permanent structures of five new underground stations (Liverpo...
09/07/2018
Fire design strategy in permanent tunnel linings (secondary linings)
This paper focuses on the fire design strategy that has been set up for permanent tunnel linings (secondary linings), with regard to their structur...
09/07/2018