Document Title | Document Type | Abstract | Authors | Publication date |
---|---|---|---|---|
A Deep-mined Station on the Elizabeth line, London | Journal Publication |
This paper describes some of the key challenges and lessons learned in creating a deep-mined, sprayed-concrete lined station shell for London’s new Elizabeth line. Tottenham Court Road station was one of five such stat... |
Adrian St.John, BEng (Hons) Eur Ing FICE CEng, John Barker BSc Eur Ing MICE CEng, Stephen Frost BSc Eur Ing FICE CEng MCIHT, David Harris BSc MSc DIC CGeol FGS, ICE Publishing | 14/03/2017 |
Will Augmented Reality in Construction Deliver on its Promise | Journal Publication |
The concept of using an electric display that overlays data onto real life was first mention in 1901 by Author L Frank Baum. It was not until 1990 until the term ‘Augmented Reality’ was coined by Thomas P. Ca... |
Stephen Smith, ICE Publishing | 19/08/2016 |
Environment Webinar – Crossrail Learning Legacy Environment Theme | Video |
This is the first in a series of Crossrail Learning Legacy webinars focused on the Environment Theme, hosted by our partners at CIRIA and IEMA. This webinar aims to provide an overview of the Crossrail Learning Legacy pr... |
Rob Paris MSc MCIWEM MIES, Simon Bennett BEng(Hons) FCILT MCIPR AMICE | 29/09/2016 |
Crossrail IT PMO Set-up | Micro-report |
This micro report provides an outline of some of the key functions carried out by the IT Project Management Office (PMO) team at Crossrail covering lessons learned around Governance, Procurement, Reporting and Managing C... |
Dr Isao Matsumoto | 14/03/2017 |
Crossrail Management Plan | Good Practice Document |
The Crossrail Management Plan, documents the arrangements adopted by Crossrail for the delivery of the Crossrail Programme in accordance with the Delivery Strategy. It is arranged into four volumes as follows: Volume 1: ... |
Crossrail Ltd | 14/03/2017 |
Realistic Expectations While Monitoring with Networked Robotic Total Station Systems in Live Rail Environments. | Technical Paper |
The CRL project has dedicated more than £150 Million to the complete life cycle of automated optical monitoring of rail assets. These optically based systems have been the primary source of monitoring in the majority of... |
J. Brzeski, Javier González Martí MSc MBA, J. Sánchez Barruetabena, ICE Publishing | 31/08/2016 |
Vehicle Movement Planning System | Micro-report |
This document summarises the approach taken by Crossrail’s IT department to deliver a system that would meet the requirements of Crossrail’s Traffic Co-ordination Centre and how the challenges inherent in a complex, ... |
Will Vogli | 14/03/2017 |
Excavated Materials Story | Micro-report |
The construction of the Crossrail project resulted in the generation of over 7 million tonnes of excavated material, of which over 98% was beneficially reused. Crossrail adopted a client-led approach to the reuse of th... |
Lorna Mellings BSc MSc CEnv MIEMA, Greg Limna BEng(Hons) CEng MICE | 31/03/2017 |
Observations of tunnelling effects on a large diameter jointed concrete pipe on Crossrail Contract C310 at North Woolwich, Newham, London. | Technical Paper |
This paper presents observations and monitoring results of ground movements arising from construction of the Crossrail Contract C310 tunnels and its subsequent impact on a large diameter concrete inlet. The Store Road In... |
Alex Liew, ICE Publishing | 31/08/2016 |
Data Architecture Strategy | Micro-report |
Data architecture can be defined as the set of rules, policies, standards and models that govern and define the type of data collected and how it is used, stored, managed and integrated within an organization and its dat... |
Alistair Goodall BSc(Eng)Hons ACA | 14/03/2017 |