Document Title | Document Type | Abstract | Authors | Publication date |
---|---|---|---|---|
Occupational Health and Wellbeing Strategy | Case Study |
Occupational health is intrinsically linked to good performance and work life balance. The Crossrail occupational health and wellbeing strategy has been developed to incorporate a four-cornerstone model on which to build... |
Christina Butterworth RN, SCPHN, Hon.FFOM | 19/09/2017 |
Tunnelling under the Barbican – engaging stakeholders | Technical Paper |
Tunnelling under the Barbican raised significant concerns from both the Barbican Centre and residents. The Barbican Centre required assurances that its concert programme would be undisturbed by both the construction and ... |
Nina Radford MA | 19/09/2017 |
2002 Stakeholder Consultation Document and Corridor 6 update | Good Practice Document |
To seek views on possible routes for the scheme Cross London Rail Links undertook a Stakeholder Consultation in 2002, including an update in December 2002/January 2003 to add a route option to Richmond. These documents... |
Crossrail Ltd | 06/05/2002 |
Round 2 Consultation Document (‘Developing Crossrail’) | Good Practice Document |
Cross London Rail Links held a second round of public consultation on its proposals between 5 August and 27 October, 2004. This document was produced to provide an overview of Crossrail’s developing proposals and was... |
Crossrail Ltd | 02/08/2004 |
Vision Leaflet | Good Practice Document |
Crossrail held a public consultation round in autumn 2003. Ahead of this a public awareness campaign was held from 8 to 29 September 2003 to ensure that residents, businesses and passengers who would be affected by the... |
Crossrail Ltd | 01/09/2003 |
Environmental Supplier Performance: Civils | Video |
This was the ninth in the series of Crossrail Learning Legacy webinars focused on the Environment Theme. This webinar presents an overview of the approach taken by Crossrail to measuring the environmental performance of ... |
Rhian Locke BSc MSc CEnv AIEMA, Gary O’Brien | 29/06/2017 |
Physically Managing Possession of Land and Property | Micro-report |
This paper identifies the implications and practical solutions on how best to take possession of land and property using Parliamentary powers and successfully manage that land during the course of a major project. It ide... |
Paul Bolton BSc BSc (Hons) MRICS MCIOB MBIFM | 19/09/2017 |
Comments Card Consultation Round 2 | Good Practice Document |
During the first round of public consultation comment was recorded by the project representatives at information centres received in letters and emails and recorded by the helpdesk officers from telephone calls. Data e... |
Crossrail Ltd | 02/08/2004 |
Pre-Bill Information Round Panels | Good Practice Document |
Panels were produced for display and distribution for Information Rounds ahead of the submission of the initial hybrid Bill and then for each of the Additional Provisions. These panels were created to give detail of the ... |
Crossrail Ltd | 07/02/2005 |
Round 2 Consultation Information Panels | Good Practice Document |
Cross London Rail Links held a second round of public consultation between August and October 2004. These panels were created to give detail of the proposals as they stood at the time of the 2004 consultation so that pe... |
Crossrail Ltd | 02/08/2004 |