Collaboration at Crossrail Case Study

The Crossrail programme consists of individuals from multiple organisations. At Crossrail’s peak, over 10,000 people worked on the project across more than 40 construction sites with a supply chain that stretched over ...

Rob Jones, Ally Salisbury 27/09/2016
Quality Management Principles, Policies and Requirements Good Practice Document

The purpose of this document is to formally set out and communicate the quality management principles, policies and requirements to be deployed by CRL in managing the Central Section Works (CSW) project. This document is...

Crossrail Ltd 27/09/2016
Addressing Skills Gaps Through Direct Intervention (TUCA) Case Study

A major challenge of Crossrail was to mobilise the large, skilled workforce required to deliver the tunnelling phase of the project. Early on in the project it became apparent that the existing UK industry did not have e...

Georgina Bigam, Nathan Pascutto 27/09/2016
Crossrail Procurement Delivery Case Study

This paper sets out the origins and approach to Procurement at Crossrail, the development of the ‘Six Pillars’ of procurement, and how these were deployed to successfully deliver over £11bn of capital spend over a 5...

Kevin Lloyd-Davies BA Post Grad DipFM (CEM) FRICS MBIFM, Martin Rowark FRICS, John Mead BSc(Hons) MSc MCIOB, Peter Sell BSc(Hons) MRICS 27/09/2016
Use of linked monitoring systems for asset protection at Finsbury Circus during SCL tunnelling for Crossrail Station. Technical Paper

Underground construction projects in inner city environments inevitably induce surface and sub-surface ground movements. The detection and management of these ground movements is essential in order to maintain a safe env...

B. Szabo, J. Brzeski, Javier González Martí MSc MBA, ICE Publishing 07/09/2015
Crossrail’s Approach to Health and Safety Assurance Assessment Micro-report

Health and safety assurance assessments allowed the Crossrail H&S assurance team to react to evolving issues with a flexible assessment outside of the formal audit programme. Some assurance assessments were tightly f...

Steve Mullins 27/09/2016
Impact on the Post Office Tunnel from SCL Tunnelling at Liverpool St Technical Paper

From its unveiling in 1927, the Post Office tunnel provided much of London’s mail and parcel transportation across the city, all the way up to its suspension in 2003. Since then, it has remained an historic asset of Lo...

Christopher Wade, Dr Alfred Stärk Dipl Ing Dr Ing 07/09/2015
Quantitative Risk Assessment Procedure Good Practice Document

The purpose of this procedure is to set out how Quantitative Risk Assessment (QRA) is undertaken on Crossrail. It represents a quality plan for achieving Crossrail risk management objectives. It is written to accord with...

Crossrail Ltd 27/09/2016
Work Breakdown Structure Micro-report

This micro-report gives an overview of how the work breakdown structure (WBS) has been developed and how it is maintained and controlled across the Crossrail programme through the Cost Management System (PRISM). It will ...

Richard Palczynski FICE FAPM 27/09/2016
Supply Chain Data Management and Control Micro-report

Effective and accurate monitoring of the risk profile of a huge and diverse supply chain on a complex project requires the ability to collect data and store it in a safe and reliable place. For many people an Excel sprea...

Simon Pain BA(Hons) ACA MCIPS, Calum Upchurch 27/09/2016