Document Title | Document Type | Abstract | Authors | Publication date |
---|---|---|---|---|
Managing Construction Noise in an Urban Environment | Video |
This is the tenth and final webinar in a series of Crossrail Learning Legacy webinars focused on the Environment Theme. It describes how Crossrail has worked in collaboration with its contractors to drive improved perfor... |
Andrew Bird BSc (Hons) MIOA, Colin Cobbing BSc(Hons), CEnvH, MCIEH, MIOA | 20/07/2017 |
Environmental Management Planning | Video |
This is the eighth in the series of Crossrail Learning Legacy webinars focused on the Environment Theme. Crossrail is one of the largest single infrastructure investments ever undertaken in the UK. Delivering Crossrail h... |
Cathy Myatt MA MSc, Rob Paris MSc MCIWEM MIES | 25/05/2017 |
Information Round Document | Good Practice Document |
Cross London Rail Links held an information round ahead of the submission of the hybrid Bill in 2005. This document was produced to provide an overview of the final proposals going into the hybrid Bill being presented ... |
Crossrail Ltd | 07/02/2005 |
Project Lifecycle Stakeholder Engagement | Video |
The promotion and delivery of the Crossrail programme has involved extensive communication with directly impacted stakeholders and all those interested in the scheme. Starting with initial engagement during route optio... |
Simon Bennett BEng(Hons) FCILT MCIPR AMICE | 16/08/2017 |
Crossrail’s Approach to Carbon Management | Video |
This webinar describes the identification and management of whole life carbon on Crossrail. It sets out the process of footprinting in the early stages of a project and the problems of creating a meaningful baseline. Cro... |
Mike de Silva BSc PhD FCIWEM MIEEM CSci C.WEM | 27/04/2017 |
Round 2 Public Consultation Results | Good Practice Document |
This document describes the public consultation activities carried out from 5 August, to 27 October, 2004. It explains who was consulted, summarises the comments received and reports on the project’s response to these ... |
Crossrail Ltd | 07/02/2005 |
Implementing A Mental Health Programme | Micro-report |
Mental health means different things to different people and like physical health it is ever present and can fluctuate depending on internal and external factors. A conscious decision was made to establish the Crossrail ... |
Christina Butterworth RN, SCPHN, Hon.FFOM | 19/09/2017 |
Managing the Largest Construction Estate in Europe | Micro-report |
This paper explains how estate land and property is successfully managed throughout the life of a major construction project. It will briefly touch on the control measures used to track, record and account for a change o... |
Paul Bolton BSc BSc (Hons) MRICS MCIOB MBIFM | 19/09/2017 |
The use of InSAR (Interferometric Synthetic Aperture Radar) to complement control of construction and protect third party assets | Case Study |
Instances of the use of InSAR on the Crossrail project are presented in this case study and the process of working with InSAR data via GIS software is reviewed. Advantages of InSAR include its low cost relative to other ... |
Javier González Martí MSc MBA, Simon Nevard MSci ARSM, Jordi Sanchez MSc MSc GIS | 19/09/2017 |
Crossrail: Building a Virtual Version of London’s Elizabeth line – The Development of the BIM Environment | Journal Publication |
The Crossrail project to deliver London’s new Elizabeth line involves building two railways: a virtual one and a physical one. The virtual version was used to facilitate design, construction and subsequent operation of... |
Malcolm Taylor, ICE Publishing | 25/09/2017 |